Method edition: the Basic Point-to-Point Calculation Procedure of the Eaton (formerly Cooper) Bussmann series Selecting Protective Devices (SPD) handbook, 2018 edition (2017 NEC), Section 4.1: Steps 1-6, Steps A-C (known primary current), Notes 1-5 and Table 4.1.7.6.a (C values). The worked examples the app reproduces are the ones printed in Eaton's Electrical Formulas extract (© 2014 Eaton). All 168 600 V C values were compared with the 2014 Eaton text, SPD 2018 Table 4.1.7.6.a and the Cooper Bussmann SPD 2002 edition: they agree cell for cell. The 2018 text was read through an agreeing distributor copy of the Eaton handbook, because Eaton's own server would not serve section 4. NEC (NFPA 70) 2023 110.9, 110.10 and 110.24 are context only; these are not the printed NFPA 70-2023 (see the notes).
- Required inputs, no defaults: arithmetic, system, transformer kVA, secondary voltage, %Z, the %Z tolerance, the source and the list of points (it may be empty). The guide says multiply %Z by 0.9 for the high-end worst case (the case for ratings and the 110.24 marking), by 1.1 for the low end; 1.0 uses the nameplate %Z as is. Motor current, ratings and names are optional, and a missing motor current is reported as "none" in the result. Unknown keys, true/false values and out-of-range values are rejected. Primary voltage and source value are rejected (not ignored) with an infinite source.
- Arithmetic: Exact uses exact fractions (no intermediate rounding, so a true x.5 always rounds up) with sqrt(3) taken at 28 significant digits, 1.732050807568877293527446342; only the displayed currents are rounded (whole amperes, half up) and every flag compares displayed values. Guide rounding reproduces the printed worked example: 1.732, full-load amps to 0.1 A, f and M to 4 decimals, currents to whole amperes, and each point starts from the rounded current above it. The guide's other worked examples print a few figures 1-2 A away from either rule. The two modes can differ by a few amperes (the guide rounding steps add up, most on large units and long chains); use Exact for a field marking or a rating decision, and Guide rounding only to compare with the printed example. Guide rounding of the full-load amps to 0.1 A is up to 0.5 percent at under 10 A (28 percent at 0.1 kVA, 416 V), and the result warns when that applies.
- Single-phase: line-to-line uses the secondary voltage as E; line-to-neutral uses E = secondary voltage / 2 (a 120/240 V center-tapped winding), 1.5 x the line-to-line current at the transformer terminals (Note 5, an approximation) and assumes the neutral and line conductors are the same size. The factor 2 in f counts the current path out and back. Line-to-neutral with a finite source is rejected: the guide gives no procedure.
- Finite source: available amperes at the transformer primary terminals at the primary voltage (Steps A-C), or a utility MVA converted with I = MVA x 1,000,000 / (1.732 x V) (3-phase) or MVA x 1,000,000 / V (1-phase): that conversion is the app's own conversion, not printed in the guide.
- Motor contribution: multiplier x the total motor full-load amps you enter, added, not attenuated, to the symmetrical RMS current at every fault location (the current guide's method); the f factors use the current without it. Values of 4 to 6 are commonly accepted: the optional motor multiplier field takes 4 to 6; when it is blank the app uses 4, the low end of the range (not an upper bound), and the result says so.
- C values: Table 4, 600 V, copper or aluminum, three single conductors or three-conductor cable, steel or nonmagnetic conduit, 14 AWG to 1000 kcmil; n is the number of conductors per phase. Busway (Table 5) is not modeled in 0.1.x and neither are 5 kV and 15 kV cables. Secondary voltage above 600 V is rejected.
- Rating comparison: the rating is a whole number of amperes (an interrupting rating or the equipment SCCR); it is adequate when it is at least the displayed total. NEC 110.9 requires an interrupting rating at least equal to the current available at the line terminals; 110.10 requires the devices and equipment short-circuit current ratings to be coordinated; 110.24 requires service equipment in other than dwelling units to be field marked with the maximum available fault current and the date of the calculation. These are context summaries, not code text.
- Not covered: utility voltage variation (Note 3), asymmetrical and peak current, arc flash, line-to-ground faults, generators, current-limiting devices and series ratings, busway, medium-voltage cable, switch and fuse impedance, and transformer connections other than one 3-phase or center-tapped 1-phase winding.