Electrical

Electrical design

New to these tools?Try a worked example →

Choose an app

How these tools work

Voltage Drop

NEC 2023 Ch. 9, Tables 8 & 9

NEC Chapter 9 Tables 8 and 9 voltage drop for 1-phase, 3-phase and DC, Cu or Al, parallel sets, and minimum size for a target.

3 free calculations

Open app →

Power Factor Correction

Power triangle (IEEE Std 141 Ch. 8); NEC Art. 460 installation

Capacitor kVAR to raise a load from its existing to a target power factor, with kVA before and after, from the power-triangle equations.

3 free calculations

Open app →

Dwelling Service Load

NEC 2023 Art. 220 Part III, standard method

NEC 2023 Article 220 standard method for one dwelling: lighting, appliances, range, dryer, EVSE, heating or cooling, service size.

3 free calculations

Open app →

Lighting (Lumen Method)

Lumen method N = E x A / (F x CU x LLF); CU and LLF entered by you

Number of luminaires for a target average illuminance by the lumen method, with the achieved illuminance. You enter CU and LLF from product data.

3 free calculations

Open app →

Conductor Ampacity & Sizing

NEC 2023 Table 310.16, 310.15, 110.14(C), 240.4(D)

NEC 2023 Table 310.16 conductor sizing for Cu or Al: 125% continuous load, ambient and more-than-3-conductor adjustment, 110.14(C) termination limit and 240.4(D) small-conductor limits.

3 free calculations

Open app →

Transformer Size & Protection

NEC 2023 450.3(B), 240.6(A), 240.21(C)

NEC 2023 450.3(B) transformer sizing and primary/secondary overcurrent protection for 1-phase and 3-phase units 1000 V or less, with standard 240.6(A) ratings and optional secondary conductors.

3 free calculations

Open app →

Available Fault Current

Eaton/Bussmann SPD point-to-point method, 600 V class

Available fault current by the Eaton/Bussmann point-to-point method: transformer FLA and multiplier with %Z tolerance, optional motor contribution and f/M factors at each downstream point.

3 free calculations

Open app →

Box Fill

NEC 2023 314.16, Tables 314.16(A) and (B)(1)

Required box volume by the NEC 314.16(B) counting rules, pass/fail for a chosen box and the smallest standard metal box.

3 free calculations

Open app →

Conduit Fill

NEC 2023 Chapter 9, Tables 1, 4, 5 and 8

Percent fill and the smallest trade size for mixed conductors in EMT, PVC, RMC and other raceways, NEC Chapter 9.

3 free calculations

Open app →

Motor Branch Circuit

NEC 2023 Article 430, single motor

Single-motor branch circuit: table FLC, conductor, overload, short-circuit and ground-fault device and disconnect, step by step.

3 free calculations

Open app →

Grounding Conductor Sizing

NEC 2023 Tables 250.122 and 250.66

EGC by OCPD rating with the 250.122(B) increase, and GEC by service conductor size with the electrode limits.

3 free calculations

Open app →

Photometric Analysis & Lighting LayoutBeta

IES LM-63 photometry; point-by-point E = I cos(gamma) / d^2; IES RP-8 parking basis

Point-by-point illuminance from IES photometry, interactive fixture layout, interior and site

Auto-layout is included with OTW Pro and OTW Team.

3 free calculations

Open app →

PV String Sizing

NEC 2023 Sec. 690.7, 690.8

Cold-weather Voc, modules in series against the inverter and MPPT window, system voltage limit and 690.8 circuit currents.

3 free calculations

Open app →

Conductor Resistance and Impedance

NEC Chapter 9 Tables 8 and 9 (75 C)

DC and AC resistance, reactance and effective Z for one conductor, corrected to temperature, and the ohms of a run. Voltage drop: the Voltage Drop app.

3 free calculations

Open app →