OTWapps
OTWapps
All apps
HomeSearch
Civil / Site
Full Site and Stormwater DesignPeak Runoff (Rational Method)Stormwater Runoff (TR-55)Earthwork Cut & FillGutter Spread & Inlet CapacityOutlet Structure RatingRiprap Outlet ProtectionGrass-Lined Channel & SwaleADA Ramp SlopeStorm Pipe SizingCulvert Capacity & SizingDetention Pond RoutingOpen-Channel FlowPavement DesignVertical CurvesSanitary SewerParkingFire Service LineModified Rational DetentionLift StationFull Lift Station Design
Structural
Wind Main Frame (MWFRS)Wind Components & Cladding (C&C)Load CombinationsLive LoadsWood BeamWood ColumnJoist & Rafter SpanSteel BeamSteel ColumnSeismic Base ShearSpread FootingCantilever Retaining WallTruss AnalysisSign StructuresSnow LoadsWood Shear Wall & DiaphragmConcrete VolumeRebar Weight & QuantityConcrete BeamCrane Runway BeamHelical Piles and AnchorsSolar Roof AttachmentTilt-Up Wall PanelSolar Ground-Mount PileFence and Freestanding Wall Wind
Electrical
Voltage DropPower Factor CorrectionDwelling Service LoadLighting (Lumen Method)Conductor Ampacity & SizingTransformer Size & ProtectionAvailable Fault CurrentBox FillConduit FillMotor Branch CircuitGrounding Conductor SizingPhotometric Analysis & Lighting LayoutPV String SizingConductor Resistance and Impedance
Mechanical
Duct SizingExhaustVentilationPsychrometricsHydronic Pipe Pressure DropPump and Fan PowerNPSH Available
Plumbing
Water Supply SizingDrain Fixture UnitsStorm/Roof DrainGas Pipe SizingWater Heater SizingSump Pump SizingWater Hammer (Surge)Pipe Thermal Expansion and Loop
Fire Protection
Sprinkler K-FactorSprinkler Design Area & DemandHydrant Flow Test & Supply CurveFire Extinguisher PlacementOccupant Load
AboutPricingAccount

Modified Rational Detention Calculator FHWA HEC-22 / agency Modified Rational Method

FHWA HEC-22 / agency Modified Rational Method
This app is temporarily unavailable.
Method, assumptions and limits (read before use)
  • Method: for each storm duration D ≥ Tc the peak inflow is Qi = Cd i(D) A. The inflow hydrograph is a trapezoid: it rises to Qi at Tc, stays constant to D and falls to zero r·Tc later (a triangle when D = Tc). Inflow volume Vin = 60 Qi (D − Tc/2 + r Tc/2) cubic feet. Storage V(D) = Vin − Vout. The largest V over the durations tested is the required storage and its duration is the critical duration (Montana DEQ Circular 8 Sec. 3.7.2; City of Austin DCM 8.4.1; City of Bentonville DDM V-5.5.1; FHWA HEC-22 4th ed. Sec. 10.3.1).
  • Outflow assumption (a judgment call, stated here and in every result): the default linear ramp has the outflow rise in a straight line from zero at the start of the storm to the allowable release Qa at the end of the storm duration, then fall to zero over r Tc, so Vout = 30 Qa (D + r Tc). A real pond starts empty and its outlet flow rises with the water level, so it cannot release Qa from the first minute; this is the form used by Montana, Austin and Bentonville, and it is the default model. Constant release (Vout = 60 Qa D, the FAA/rectangular method) differs from the ramp by 30 Qa (D − r Tc) of outflow volume: for a storm longer than r Tc it gives less storage than the ramp, at D = r Tc the same, and for Tc ≤ D < r Tc it gives more. With r = 1 the ramp is therefore never the smaller, but with r > 1 (for example Montana, r = 1.5) the constant release can need more storage than the ramp (Montana example: 7,740 against 7,357.5 cubic feet). The result lists both models at your r, and warns when the constant release needs more. Use constant release only if your agency does.
  • Recession factor r (required, no default): 1.0 in Austin, Bentonville and HEC-22 (Vin = 60 Qi D); 1.5 in Montana DEQ-8. The choice is agency-specific and moves the result by about 14 % (Montana example: 6,345 cubic feet at r = 1, 7,357.5 at r = 1.5), so it must be entered; a blank value is rejected.
  • Allowable release: a value you enter (cfs, or cfs per acre), or the pre-development Rational peak min(Cpre Cf, 1) i(Tcpre) Apre from the same IDF and the same Cf (so a Cf above 1 also raises the release, which lowers the storage; the page warns with the numbers, and you can enter the release instead for an unadjusted value). A constant bypass flow is subtracted from it. Enter it in release in the detailed inputs.
  • Rainfall (IDF): exactly one of an IDF table (log-log interpolation), coefficients b, d, e with i = b/(D + d)e (D in minutes, as in the OTW Rational app), or one intensity for one explicit duration. Durations outside a table hold the end value (warned).
  • Durations: only D ≥ Tc. Give durations_min (a list) or sweep ({step_min, max_min}). If neither is given, 5-min steps from Tc up to 1440 min are tested (warned), stopping at the first duration whose peak inflow does not exceed the release. A sweep result is a grid search with refinement: the end of the sweep (max_min) is always tested; around every local maximum of the storage the durations are refined at 1/10 and then 1/100 of the step, and further in tenths down to 0.01 min (with an IDF table, every table duration is also a candidate, and the candidates are refined between), and the duration at which the peak inflow equals the release (where the storage falls to zero and the maximum can sit) is evaluated as one more candidate. It is a search, not an exact maximum. In testing against a dense 0.01-min reference (about 74,000 sweeps and eight worst-case searches: formula and table IDFs, real rainfall tables, kinked, sawtooth and random tables, steps from 1 to 120 min including 30- and 60-min steps) the sweep result was at most 0.005 % low, which is the effect of rounding the printed volume to 0.1 cu ft on volumes of about 1,000 cu ft (smaller volumes are limited by that rounding alone); this is a measurement on test inputs, not a guarantee for every possible table. Explicit durations_min are used exactly as entered and are not refined: the result is the largest storage among the durations listed, so a short list can miss the critical duration and come out far too low (in testing, a list holding only the points of an IDF table was about 48 % low on real full-length rainfall tables). If your agency requires listed durations, make the list dense: one duration every 1 min from Tc through the critical duration (the sweep shows where it is), plus the table durations and at least one duration beyond the critical one (up to 200 durations can be listed), or use the sweep, which refines automatically. In testing, a 1-min list was within 1 % of the sweep in all but about 0.3 % of 4,600 test lists and up to 10 % low in the worst, a very narrow storage window whose maximum sits between two listed durations; a 5-min list was up to about 48 % low. The run compares your list with a sweep from Tc to the last duration of your IDF table (to 1440 min for a formula IDF) and warns when the sweep finds more than 1 % more storage; a list of one duration always gets a warning. If an IDF table is not monotonic, the sweep stops at the first duration with no storage and the page warns when longer durations exceed the release again.
  • Status: the bar is green only when the run has no warning. Any warning (a default that was used, a problem in the IDF table, a list of durations that is too sparse, a limit of the method) turns it amber and is listed under the headline. With explicit durations the run also sweeps from Tc to the last duration of your IDF table (to 1440 min for a formula IDF) and warns, with both volumes, when the sweep finds more than 1 % more storage than your list; a list of a single duration always gets a warning, and on a table whose intensity rises with duration the warning says the list is not cross-checked. If the IDF table ends before 1440 min and the largest storage inside the table is at its last duration, the run warns that the critical duration may be longer than the table covers: extend the table to longer durations.
  • Limits: a planning estimate. It does not use the outlet rating or stage-storage, so it cannot size an outlet or prove the pond works: route the pond (Detention Pond Routing app). Many agencies limit the method to small areas (10 ac Austin infill, 25 ac Bentonville; HEC-22: Rational Method under 200 ac); the page warns at these sizes. Single event per run; no agency rainfall scaling, water-quality or channel-protection volume, cascaded ponds or time-varying bypass.
  • Fields: misspelled or unknown fields are rejected, not ignored; numbers must be numbers (not text). Text fields are limited to 80 characters (labels) and 200 characters (meta values).
Detailed calculation inputs (rainfall, release, durations, subareas, meta)

Result

Result not calculated

Confirm the inputs and the method notes before using the result.

How this result was calculated

Inputs & units
Method & assumptions
References & limitations
Engineering aid only. Professional verification required. The method notes and tags on this page are the references this app cites.

By running a calculation you agree to the Terms of Use and Privacy Policy. Results are preliminary and must be verified by a licensed professional.

Your calculation

▤Result not calculatedComplete the inputs and review before calculating.

Downloads

Review inputs, calculation steps, and assumptions in one report.

Related apps

  • Full Site and Stormwater Design
  • Peak Runoff (Rational Method)
  • Stormwater Runoff (TR-55)
  • Detention Pond Routing
  • Earthwork Cut & Fill
  • All Civil / Site apps
OTWapps
About Methods & references View plans Privacy Terms

Engineering aid only. Professional verification required.